FROM 21/12/2024 TO 06/01/2025 WE WILL BE CLOSED FOR CHRISTMAS HOLIDAYS

Lift for aerial two-rails conveyor

To make easier the loading and unloading operations of the parts, Vidali Finishing includes an elevator system in its own production line to lower and raise the bars at the loading station and unloading.

The operator can then proceed in a simple mode and safe all'appendimento of the pieces into the hooks, and in the same manner to the drain of the same.

Vidali Finishing customize this device according to the needs of the customer, to fit the size of the pieces to be loaded.